Permanent Modular ADUs Built for Hillsborough County & the Bay Area
Mesocore Modular Homes designs and installs Accessory Dwelling Units (ADUs) across the greater Tampa area. From backyard cottages and granny flats to in-law suites, rental units, and pool houses—our permanent modular construction delivers faster builds, permit-ready plans, and hurricane-resilient quality.
Turnkey building made simple: Design —> Permit —> Build
Our local zoning expertise keeps your project on track and moving quickly.

Why Tampa Homeowners Choose Mesocore
The Mesocore Model E ADU
Factory-built, hurricane-resilient, and ready to install in days.



Model E ADU
1
Bedrooms
1
Bathrooms
420
Sq. Ft.
Starts at $99k
How We Build ADUs in Tampa
See our full Adu Buiying Process here
Serving Tampa and Surronding Neighborhoods
We permit and build across Hillsborough County and surrounding areas, including:
South Tampa & Palma Ceia
Seminole Heights & Tampa Heights
Westchase & Carrollwood
Hyde Park & Davis Islands
Brandon & Riverview
Temple Terrace
Permits & Zoning in Tampa
ADU regulations in Tampa depend on your specific residential zoning district. Mesocore confirms allowable building height, lot coverage limits, and parking rules during your initial feasibility check, then handles complete permit coordination with local authorities.
Financing Options for Your ADU
Many Hillsborough County homeowners use HELOCs, renovation loans, or cash-out refinance to fund ADUs. We can connect you with lenders familiar with modular construction projects.
Tampa ADU FAQs
Does Tampa allow ADUs?
Yes, most residential zones permit ADUs with conditions. We confirm zoning for your specific address.
How long does it take to build an ADU?
Once permits are issued, modular installation and finishing are typically faster than traditional builds.
Our 420 sq ft ADU can be built in as little as 10 days.
Can I rent my ADU in Tampa?
Yes, many homeowners use ADUs for short-term rentals or family housing, provided local rules are followed.
A great way to generate additional income.
Do I need extra parking?
Some zoning districts require additional off-street parking; we’ll confirm during feasibility.
Can my ADU be connected to my existing septic system?
In most cases you can connect to your existing septic as long as it is large enough to handle additional plumbing.
This will be found out during feasibility.
Claim Your Free ADU Space Check
Fill out the form below with your property address. Our team will review local zoning rules, lot setbacks, and buildable area for your lot, and email you the results.
