Modular ADU vs Stick-Built ADU in Orlando & Orange County, FL
Insights
January 30, 2026
5
minute read

Which Makes More Sense for Central Florida Homeowners?
Building an ADU in Orlando or Orange County comes with unique challenges — from heavy summer rain to tight labor availability. Choosing between a modular ADU and a stick-built ADU can significantly affect your timeline, budget, and stress level.
Here’s a clear breakdown of which construction method makes the most sense in Central Florida.
How Orlando’s Climate Impacts ADU Construction
Central Florida’s weather is one of the biggest variables in construction.
Stick-built ADUs in Orlando
Frequent rain delays during summer months
Materials exposed to moisture during framing
Inspections often pushed back due to weather disruptions
Modular ADUs
Built indoors, unaffected by rain or heat
Installed on-site in days, not months
Reduced risk of moisture-related issues
Advantage: Modular ADUs
Labor Availability in Orange County
Orlando’s construction market is competitive, with labor stretched across:
New housing
Commercial development
Theme park and hospitality projects
Stick-built risks
Subcontractor scheduling delays
Timeline creep
Rising labor costs mid-project
Modular advantage
Factory labor already secured
Predictable schedules
Fewer on-site trades needed
Permitting & Predictability
Permitting timelines in Orlando and unincorporated Orange County can vary widely based on zoning and utilities.
Modular ADUs offer an advantage because:
Design is finalized early
Fewer field changes trigger re-review
Installation phase is short and controlled
Which Is Better for Orlando Homeowners?
For most Orlando-area homeowners, modular ADUs provide faster delivery, better cost control, and fewer weather-related delays. Stick-built ADUs may make sense for highly custom designs, but come with higher risk.
