ADU Laws and Regulations in Pasco County, Florida

Insights

December 14, 2025

minute read

Key Takeaways

  • Pasco County's Board of County Commissioners approved a comprehensive plan amendment to permit ADUs on February 25, 2025, officially allowing ADUs in single-family residential zoning districts throughout unincorporated areas, creating new opportunities for homeowners seeking rental income or multigenerational housing solutions

  • Maximum ADU size is 1,200 square feet by-right, with units required to be smaller than the principal dwelling and built on permanent foundations—mobile homes and RVs do not qualify

  • Impact fees are tiered by size with units under 500 square feet completely exempt, 500-900 square feet receiving discounted rates, and units over 900 square feet paying full fees—making smaller modular ADUs particularly cost-effective

  • Short-term rentals are prohibited for all Pasco County ADUs, meaning Airbnb and VRBO uses are not permitted, but long-term rentals generating consistent monthly income are allowed

  • Online permitting through PascoGateway streamlines applications, plan reviews, fee payments, and inspection scheduling, with typical processing times of 4-8 weeks for complete submissions

  • Modular construction offers significant advantages over traditional building methods, with factory-built units meeting Florida Building Code requirements while reducing on-site construction time from months to weeks

  • Federal solar tax credits of 30% apply to integrated solar systems through 2032, and Florida's property tax exemption ensures renewable energy equipment does not increase taxable property value

Understanding Pasco County ADU Regulations: What is an Accessory Dwelling Unit?

An accessory dwelling unit (ADU) is a secondary living space located on the same lot as a primary single-family residence. Under Florida Statutes § 163.31771, an ADU is defined as "an ancillary or secondary living unit that has a separate kitchen, bathroom, and sleeping area, existing either within the same structure, or on the same lot, as the primary dwelling unit."

Pasco County's Board of County Commissioners approved a comprehensive plan amendment to permit ADUs on February 25, 2025. This amendment now permits ADUs as an accessory use to single-family residential development in qualifying zoning districts throughout unincorporated county areas. This ordinance follows comprehensive plan amendments that recognize ADUs as a viable solution for housing affordability and flexibility.

Common Types of ADUs Allowed

Pasco County permits several ADU configurations:

  • Detached ADUs: Separate structures in rear or side yards

  • Attached ADUs: Additions or conversions within existing structures

  • Garage conversions: Converting existing garages to living space

The ordinance explicitly prohibits mobile homes, RVs, trailers, and temporary structures from qualifying as ADUs. All units must be built on permanent, fixed foundations and comply with Florida Building Code requirements.

Pasco County Zoning and Permitting for Your ADU

Before designing your ADU, verify your property's eligibility through the Pasco County Planning & Development Department at 8731 Citizens Drive, New Port Richey, FL 34654, or by calling (727) 847-2411.

Key Zoning Requirements

ADUs are permitted in zoning districts that allow single-family residential development within unincorporated Pasco County. Property owners must verify:

  • Current zoning designation permits ADUs

  • Lot size and coverage allowances accommodate the proposed unit

  • Setback requirements match those of primary structures

  • Flood zone status (ADUs are now permitted in FEMA flood zones with proper elevation)

  • Easements and utility locations do not interfere with placement

Navigating the Permitting Process

The PascoGateway online portal serves as the primary submission platform for ADU building permits. The step-by-step process includes:

  1. Create an account on PascoGateway and verify your email

  2. Start a new application selecting Building → Residential → Accessory Structure

  3. Enter project details including site address, parcel number, and estimated construction value

  4. Upload required documents including site plans, architectural plans, structural engineering, and MEP drawings

  5. Pay initial fees to enter the review queue

  6. Monitor review status and respond to any correction requests

  7. Schedule inspections after permit issuance

Processing time typically ranges from 4-8 weeks depending on submission completeness and complexity.

Required Documentation

Pasco County Building Construction Services requires comprehensive documentation including:

  • Site plan/survey showing property boundaries, existing structures, and proposed ADU location

  • Architectural plans with floor plans, elevations, and materials specifications

  • Structural plans with foundation design and wind load calculations

  • MEP (Mechanical, Electrical, Plumbing) plans

  • Florida Energy Efficiency Code compliance forms

  • Three ADU-specific affidavits required for new ADU applications: ADU Affidavit General, ADU Affidavit Owner Disclosure, and ADU Affidavit Affordable ADUs (optional)

Pasco County ADU Construction Standards and Florida Building Codes

All ADUs in Pasco County must meet International Building Code (IBC) specifications and Florida Building Code requirements, including IECC energy conservation standards.

Size and Design Standards

The ordinance establishes clear parameters for ADU construction:

  • Maximum size: 1,200 square feet by-right (special exception required for larger units)

  • Must be smaller than the principal dwelling on the lot

  • Foundation: Permanent, fixed foundation required—same standards as principal structure

  • Maximum height: Cannot exceed the principal dwelling or 25 feet

Hurricane-Resistant Construction Requirements

Florida Building Code mandates specific wind resistance standards throughout the state. While Pasco County does not fall within the High Velocity Hurricane Zone (HVHZ) designation of Miami-Dade and Broward counties, hurricane-resistant construction remains essential for protecting your investment and qualifying for insurance discounts.

Key construction elements include:

  • Wind-rated exterior walls and roofing systems

  • Impact-resistant windows and doors where required by code

  • Properly engineered structural connections

  • Secondary water barrier roof installations

Mesocore's modular ADUs feature 180 mph wind ratings exceeding Category 5 hurricane thresholds, robotically welded structural steel cores, and impact-rated windows and doors—meeting or exceeding Florida's strictest building requirements.

Energy Efficiency Mandates

Florida's energy code requires:

  • Minimum insulation values (R15 walls, R24 roof, R20 floor are common standards)

  • Energy-efficient HVAC systems

  • Proper air sealing and ventilation

  • Energy Star-rated appliances where applicable

Understanding Utility Connections and Infrastructure for Pasco County ADUs

Utility connections represent a significant portion of ADU development costs and require careful planning during the design phase.

Standard Utility Connection Requirements

Typical utility connection costs in Pasco County include:

  • Water connections: $1,000-$6,000

  • Sewer lines: $1,600-$10,900

  • Electrical service: $1,000-$3,800

  • Total utility connections: $3,000-$20,000 depending on site complexity

Properties on septic systems may require additional capacity verification or system upgrades. Contact Pasco County Building Construction Services at (727) 847-8126 for site-specific requirements.

Off-Grid Capable Solutions

Mesocore's factory-built ADUs ship with integrated utility systems that can significantly reduce connection costs and ongoing expenses:

  • 6 kW solar array with 14 PV roof-mounted panels

  • Dual 10 kWh lithium-ion batteries (20 kWh total storage)

  • 1,700-gallon rainwater collection system with purification

  • Factory-installed MEP systems that are Intertek-certified before delivery

Some Florida jurisdictions, including Palm Beach County, have approved Mesocore ADUs to operate independently from the main house without utility hookup or separate meter requirements. This off-grid capability can eliminate connection fees, meter costs, and ongoing utility expenses.

Financial Incentives and Costs for ADUs in Pasco County

Understanding the complete cost picture helps homeowners make informed decisions about ADU development.

Permit and Impact Fee Structure

Building permit fees are calculated based on construction valuation rather than flat rates. The Pasco County impact fee structure creates significant savings for smaller units:

  • Under 500 sq ft: Impact fees exempt | Estimated Total Permit Costs: $1,200-$2,000

  • 500-900 sq ft: Impact fees discounted | Estimated Total Permit Costs: $3,200-$5,650

  • Over 900 sq ft: Full fees apply | Estimated Total Permit Costs: $8,550-$13,725

Use the Pasco County Impact Fee Calculator to determine exact fees for your property and proposed unit size.

Federal Solar Tax Credits

The federal Investment Tax Credit offers federal solar incentives of 30% through 2032, dropping to 26% in 2033 and 22% in 2034. A $30,000 integrated solar system generates a $9,000 federal tax credit with no maximum limit.

Mesocore's standard 6 kW solar array with dual 10 kWh batteries qualifies for the full 30% credit, potentially saving over $9,000 while providing energy independence and lower operating costs.

Florida State Incentives

Florida provides additional tax benefits:

  • 0% sales tax on solar equipment

  • Property tax exemption for renewable energy installations (solar and battery systems do not increase taxable property value)

  • Granny Flat tax reduction (the lesser of the ADU's added value or 20% of total assessed property value) when occupied by a parent or grandparent age 62+. This is a local-option exemption that must be verified with the Pasco County Property Appraiser

Financing Options

Ocean Capital Lending provides customized financing specifically designed for Mesocore's modular home designs, covering land acquisition and construction costs with conversion to traditional mortgage upon completion. Learn more at Mesocore's financing page.

Benefits of an ADU in Pasco County: Rental Income and Multigenerational Living

Pasco County's new ADU ordinance opens significant opportunities for homeowners seeking additional income or flexible living arrangements.

Rental Income Potential

Long-term rentals are permitted under Pasco County's ADU regulations, though short-term vacation rentals (Airbnb, VRBO) are explicitly prohibited. Florida's rental market fundamentals support strong returns:

  • The global Accessory Dwelling Unit Market is estimated at approximately $21.45 billion in 2026, projected to reach $47.31 billion by 2035, expanding at a CAGR of 9.19%

  • 33% of consumers prefer modular/prefab construction for ADUs

  • Average Florida ADU rental income reaches $2,200/month in major markets

A Mesocore Model E ADU at $129,000 generating $2,200/month in rental income delivers an 18.4% annual ROI with a 5.4-year payback period.

Multigenerational Housing Solutions

ADUs provide private, independent living spaces for extended family members while maintaining proximity to the main household:

  • Aging parents can remain close while preserving independence

  • Adult children can save for their own home purchase

  • Caregivers can live on-site with separate quarters

  • Florida's Granny Flat tax reduction provides additional savings when seniors occupy the unit

Comparing Permitted ADU Styles in Pasco County

Pasco County allows multiple ADU configurations, each with distinct advantages.

Detached vs. Attached ADUs

Detached ADUs offer:

  • Maximum privacy for occupants and primary residence

  • Flexible placement in rear or side yards

  • Independent utility connections possible

  • Higher rental income potential due to privacy

Attached ADUs provide:

  • Lower construction costs through shared walls

  • Simplified utility connections

  • Easier accessibility for aging relatives

  • Smaller footprint requirements

Garage Conversions

Converting existing garages offers cost advantages but requires:

  • Minimum habitable area of 220 square feet

  • Full compliance with residential building codes

  • Proper egress windows in sleeping areas

  • HVAC, plumbing, and electrical upgrades

What's NOT Permitted

Pasco County's ordinance explicitly prohibits:

  • Mobile homes or manufactured housing (HUD code units)

  • RVs or travel trailers

  • Temporary structures

  • Any unit not on a permanent foundation

Choosing a Builder: Modular ADUs and Hurricane Resilience in Florida

Selecting the right construction method impacts cost, timeline, quality, and long-term durability.

Modular Construction Advantages

Factory-built modular ADUs offer significant benefits over traditional site-built construction:

  • Speed: 10-day on-site installation versus 6-14 months for traditional construction

  • Quality control: Factory inspections at every production stage in climate-controlled environment

  • Weather independence: 60-95% factory completion eliminates weather delays

  • Cost predictability: Fixed pricing with fewer change orders and delays

  • Florida Building Code compliance: Units arrive pre-certified and inspected

Mesocore's Hurricane-Resistant Design

Mesocore's Model E ADU delivers superior storm protection with:

  • 180 mph wind rating exceeding Category 5 hurricane thresholds of 157 mph

  • Robotically welded structural steel core for maximum strength

  • Impact-rated windows and doors meeting Florida's strictest standards

  • TPO roofing with proper secondary water barriers

  • Engineered connections qualifying for 20-55% insurance premium discounts

Federal studies confirm post-1994 manufactured homes meeting modern wind standards experienced zero significant damage during intense 2004-2005 hurricane seasons.

Streamlining Your Pasco County ADU Project with Mesocore's Advantage

Mesocore's integrated approach simplifies the entire ADU development process from order to occupancy.

Factory-Direct Efficiency

Operating from their West Palm Beach factory, Mesocore serves all of Florida with factory-direct delivery, minimizing transportation costs within the 250-400 mile optimal range that covers Pasco County. Units ship as standard 20-foot containers expanding on-site to full square footage.

Pre-Installed, Certified Systems

All Mesocore ADUs arrive with:

  • Factory-installed MEP systems (mechanical, electrical, plumbing)

  • Intertek certification completed before delivery

  • Integrated 6 kW solar array and 20 kWh battery storage

  • 1,700-gallon rainwater collection with purification

  • Energy-efficient appliances including washer/dryer combo, refrigerator, and induction cooktop

This factory integration eliminates coordination of multiple specialized contractors while reducing costs 10-20% compared to traditional construction plus separate solar installation.

Model E ADU Specifications

The Model E ADU at 410 square feet qualifies for Pasco County's impact fee exemption (under 500 sq ft) while providing:

  • 1 bedroom with built-in storage

  • 1 full bathroom

  • Open concept living/kitchen

  • Covered porch

  • Starting price of $129,000

  • 10-day on-site installation after site preparation

Contact Mesocore at 561-386-7252 or info@mesocore.com to schedule a factory tour or free consultation for your Pasco County ADU project.

Frequently Asked Questions

Can I rent out my ADU on Airbnb or VRBO in Pasco County?

No. Pasco County's ADU ordinance explicitly prohibits short-term rentals for ADUs. This restriction was implemented to address affordable housing needs rather than tourism accommodations. Long-term rentals with standard lease agreements are permitted and encouraged, allowing homeowners to generate consistent monthly rental income while complying with county regulations.

Do I need to live on the property to build an ADU in Pasco County?

The specific owner-occupancy requirements for Pasco County ADUs should be verified directly with the Planning & Development Department at (727) 847-2411. Many Florida counties require the property owner to occupy either the principal dwelling or the ADU, but Pasco's ordinance details should be confirmed before beginning your project.

How long does ADU permitting take in Pasco County?

Complete permit applications typically process in 4-8 weeks through the PascoGateway online portal. Processing time depends on submission completeness, project complexity, and current county workload. Incomplete applications requiring corrections extend timelines significantly. Pre-application consultations with Building Construction Services can help ensure complete initial submissions.

What happens if my property is in a flood zone?

Pasco County's ADU ordinance removed previous prohibitions on ADUs in FEMA flood zones. Properties in flood zones can now build ADUs with proper elevation requirements and construction methods. Additional foundation costs of $20,000-$50,000 may apply for elevated construction. Contact Building Construction Services to determine your property's flood zone status and specific requirements.

Are there any state laws requiring Pasco County to allow ADUs?

No statewide mandate currently exists. House Bill 247 and Senate Bill 184, which would have required all Florida local governments to allow ADUs in single-family zones, failed during the 2025 legislative session. Current Florida Statutes § 163.31771 encourages but does not require local ADU ordinances. Pasco County adopted its ADU regulations independently in February 2025.

What is the difference between modular construction and mobile homes for ADUs?

This distinction is critical for Pasco County ADUs. Modular construction produces units built to Florida Building Code standards in factory settings, which ARE permitted as ADUs. Mobile homes (manufactured housing built to HUD federal standards) are NOT permitted as ADUs in Pasco County. Mesocore's factory-built units qualify as modular construction meeting all Florida Building Code requirements including hurricane resistance standards.